How We've Helped

Working Together to Deliver Solutions

Power

Transformer Loss at CCGT Power Station

An inter-turn winding failure led to a total loss of a 450 MVA transformer. Our team located a replacement from the Far East within six months, reducing Business Interruption (BI) costs and settling the loss effectively.

Read More →

Rail

Collision and Derailment of Engineering Train in Work Site

During a significant derailment, RHP helped assess damage and negotiate subrogation claims, leading to mediation-based resolution. This resulted in settling numerous third-party claims and recovering over 60% of the locomotive repair cost.

Read More →

Construction & Engineering

Water Damage to Student Accommodation Block under Construction

A student housing developer faced significant water damage caused by a subcontractor, threatening to delay a 22-storey project's completion by seven months. Quick action and innovative strategies reduced this significantly.

Read More →