Power
Transformer Loss at CCGT Power Station
An inter-turn winding failure led to a total loss of a 450 MVA transformer. Our team located a replacement from the Far East within six months, reducing Business Interruption (BI) costs and settling the loss effectively.
Read More →Rail
Collision and Derailment of Engineering Train in Work Site
During a significant derailment, RHP helped assess damage and negotiate subrogation claims, leading to mediation-based resolution. This resulted in settling numerous third-party claims and recovering over 60% of the locomotive repair cost.
Read More →Construction & Engineering
Water Damage to Student Accommodation Block under Construction
A student housing developer faced significant water damage caused by a subcontractor, threatening to delay a 22-storey project's completion by seven months. Quick action and innovative strategies reduced this significantly.